Railtrack survey drilling
- Jun 14, 2016
- 1 min read
Railtrack have finally finished using their contractor to drill and take samples of the cliff rock. There was concern that the spring in the upper field may be disturbed, but we were assured that the drill bit would go down through a sleeve so that nothing can leak into the hole left.
Comments